Infrastructure

Vidyalaya Infrastructure
 
I
Area of land  allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
:  26.08 Acres.
:   Yes
: 26/4/1996
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
: Completed, 
 
Stone wall & barbed wire fencing
iii
Permanent buildings constructed
:  CBRI Pattern
iv
School building
: Complete
v
Dormitories
:  Boys ____08_____ Nos.
   with Warden Residence__08_ Nos.
 
 
:  Girls ____04_______ Nos.
   with Warden Residence__04__ Nos.
vi
Kitchen/dining Hall
No. of shifts required for all students  to take food
:  Complete  2 Dining Halls  
    1 Shift
vii
Principal Residence
 
:  01 ___ No.
viii
Staff Quarters
 
: Type III = __28_____ Nos.
  Type II =  ___01_____ Nos.
  Type  I  = ___12_____ Nos.
 
ix
M.P. Hall
:  not available
x
Workshop
: Available / not available
xi
Type of O.H. Tank
Its capacity
Present Status
 :     Column based 
:  __1,50,000 litres
: Working satisfactory
xii
U.G. tank
Its capacity
Present Status
:  __75,000 litres
 

: Working satisfactory

xiii
D.G. Set
:  Available
: _Kirloskar make
:   __10 KV A
: Working  : Year of procurement ,1991
: _Mahindra make
:   __25 KV A
: Working  : Year of procurement ,2012
 
xiv
Sewage Pump
: _Available.
xv
Water Pump
: __10 H capacity, Cromptlion make.
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average.
 
 
 :  Urban Feeder
:   Complete
:   46 Nos. of Poles 
: _24 hrs.
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
: Available
:  ___01____Nos.   – Available
:  ___02____Nos.   – Available 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
: Potable,  01 Nos.-  working except        summer
: Potable, __NIL____ Nos.-  working / not working
:  __--____ hours supply in a day
xix
Rajiv Gandhi Smriti Van
:  Available
xx
Fire fighting arrangement
:  Working
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
:   October ,2016
:    October ,2016
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:   Yes outside the vidyalaya campus -          Not covered
xxiv
Works taken up under Special M&R fund during current year and last year:-
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year (Regular)
2015
 
 
 
 
2016
 Repairing & Replacement of Drainage Line
 
 
Roof Treatment to the old Staff Quarter (4 Blocks)
 5 Lacs
 
 
 
 
5 Lacs
 
9.5 Lacs
 
 
 
9.5 Lacs